JLG Logo
Call 01823 674151

Date

Tags Earth Moving & Civil Engineering

This project was in Kingsteignton for the housing developer Redrow Homes.

The was a large cut/fill earth moving contract which included excavating old mines and re-instating them. Followed by stabilisation of the ground with re-enforcement fabric so the developer could build houses there. Because houses were being built here the specification for the works was very high and a high level of accuracy and care was required when carrying out the works. The specification was followed and throughout the project a thorough testing regime was followed.

© 2024 John Luffman Group Ltd.
sitemap | links | cookies policy | web design by Cheslyn Edwards

Contact Details

John Luffman Group Ltd.
Maidendown Stage
Burlescombe
Tiverton
Devon EX16 7JX

Phone
01823 674151

Email
enquiries@johnluffman.co.uk

Company Info

Company No.
06905595

VAT Reg No.
123 3697 19

SMAS Worksafe Contractor, School Supply Chain Sustainability Silver, FORS Fleet Operator Recognition Scheme, Green Dragon Environmental Standard