JLG Logo
Call 01823 674151

Date

Tags Earth Moving & Civil Engineering

This was a project for the housing developer Bloor Homes.

We had to divert an existing stream and form two new attenuation ponds. The attenuation ponds were required for the nearby housing development. We also had to form a noise bund to reduce the noise pollution from the M5 using the excavated material form the new ponds.

Extra care was needed on this project due to the sensitive environmental nature of the project when working on and near an existing water course. The works was also carried out under power lines and pylons. We worked closely with the power supplier during the project and a strict set of safety criteria from the power supplier had to be met. The project went well and the client was pleased with the final outcome.

© 2024 John Luffman Group Ltd.
sitemap | links | cookies policy | web design by Cheslyn Edwards

Contact Details

John Luffman Group Ltd.
Maidendown Stage
Burlescombe
Tiverton
Devon EX16 7JX

Phone
01823 674151

Email
enquiries@johnluffman.co.uk

Company Info

Company No.
06905595

VAT Reg No.
123 3697 19

SMAS Worksafe Contractor, School Supply Chain Sustainability Silver, FORS Fleet Operator Recognition Scheme, Green Dragon Environmental Standard