JLG Logo
Call 01823 674151

Date

Tags

This project was for ISG Retail. Our works included the earthworks (cut/fill) of 15000m3 and ground stabilisation. We used cement to stabilise the soil to get the required strength into the ground. Our works also included installing the concrete foundations, foul and storm drainage, trenching and ducting for new service infrastructure, infrastructure works for electric vehicle charging, SUDs drainage/paving systems, kerbing and hard landscaping. The project was delivered on time and within budget. The client was pleased with high level of workmanship and health and safety standards.

© 2024 John Luffman Group Ltd.
sitemap | links | cookies policy | web design by Cheslyn Edwards

Contact Details

John Luffman Group Ltd.
Maidendown Stage
Burlescombe
Tiverton
Devon EX16 7JX

Phone
01823 674151

Email
enquiries@johnluffman.co.uk

Company Info

Company No.
06905595

VAT Reg No.
123 3697 19

SMAS Worksafe Contractor, School Supply Chain Sustainability Silver, FORS Fleet Operator Recognition Scheme, Green Dragon Environmental Standard